• Contents
  • About
  • Credits
    • Documentation
    • Software
    • Support Groups
  • What’s New in SAS/OR 14.1
    • Overview
    • Mathematical Optimization Updates
      • Solver Performance Improvements
      • PROC OPTMODEL Improvements
      • Other Optimization and Related Improvements
    • Discrete-Event Simulation Updates
  • Using This Book
    • Purpose
    • Organization
    • Typographical Conventions
    • Conventions for Examples
      • Accessing the SAS/OR Sample Library
      • Online Documentation
    • Additional Documentation for SAS/OR Software
  • The CLP Procedure
    • Overview: CLP Procedure
      • The Constraint Satisfaction Problem
      • Techniques for Solving CSPs
      • The CLP Procedure
    • Getting Started: CLP Procedure
      • Send More Money
      • Eight Queens
    • Syntax: CLP Procedure
      • Functional Summary
      • PROC CLP Statement
      • ACTIVITY Statement
      • ALLDIFF Statement
      • ARRAY Statement
      • ELEMENT Statement
      • FOREACH Statement
      • GCC Statement
      • LEXICO Statement
      • LINCON Statement
      • OBJ Statement
      • PACK Statement
      • REIFY Statement
      • REQUIRES Statement
      • RESOURCE Statement
      • SCHEDULE Statement
      • VARIABLE Statement
    • Details: CLP Procedure
      • Modes of Operation
      • Constraint Data Set
      • Solution Data Set
      • Activity Data Set
      • Resource Data Set
      • Schedule Data Set
      • SCHEDRES= Data Set
      • SCHEDTIME= Data Set
      • Edge Finding
      • Macro Variable _ORCLP_
      • Macro Variable _ORCLPEAS_
      • Macro Variable _ORCLPEVS_
    • Examples: CLP Procedure
      • Logic-Based Puzzles
      • Alphabet Blocks Problem
      • Work-Shift Scheduling Problem
      • A Nonlinear Optimization Problem
      • Car Painting Problem
      • Scene Allocation Problem
      • Car Sequencing Problem
      • Round-Robin Problem
      • Resource-Constrained Scheduling with Nonstandard Temporal Constraints
      • Scheduling with Alternate Resources
      • 10×10 Job Shop Scheduling Problem
      • Scheduling a Major Basketball Conference
      • Balanced Incomplete Block Design
      • Progressive Party Problem
      • Statement and Option Cross-Reference Table
    • References


ProductRelease
SAS/OR14.1
Type
Usage and Reference
Copyright Date
July 2015
Last Updated
14Jul2015