Problem Note 51345: The order of the items in the project tree might change after you migrate a SAS® Enterprise Guide® project
After you migrate a project, the order of the items in the project tree might change. This problem is most likely to occur under the following circumstances.
- You change the order of the items in the project tree.
- You do not change the order of the items in the process flow to match the order of the project tree.
- You then migrate the project.
As a result, after you migrate the project, the order of the items in the project tree is changed to match the order of the items in the process flow.
There is currently no workaround for this issue other than to manually reorder the project tree items.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Enterprise Guide | Microsoft® Windows® for x64 | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows Server 2003 Datacenter Edition | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows Server 2003 Enterprise Edition | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows Server 2003 Standard Edition | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows Server 2003 for x64 | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows Server 2008 R2 | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows Server 2008 for x64 | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Microsoft Windows XP Professional | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Windows Vista | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
Windows Vista for x64 | 4.2 | 5.1 | 9.2 TS2M0 | 9.2 TS2M0 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2013-10-29 09:51:19 |
Date Created: | 2013-10-14 15:08:04 |