Problem Note 50550: The counts for downstream Cell nodes do not clear when you change the priority in a Prioritize node in SAS® Customer Intelligence Studio
You create a campaign in SAS Customer Intelligence Studio that contains
a Prioritize node with two output cells. When you execute the campaign, the output cell shows the counts.
Next, open the properties
of the Prioritize node and change the order using the arrows. The counts for the
downstream Cell nodes are not cleared. This leaves the campaign in an incorrect state.
This problem does not occur with earlier releases of SAS Customer Intelligence Studio.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Marketing Automation | Solaris for x64 | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
Linux for x64 | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
HP-UX IPF | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
64-bit Enabled HP-UX | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
64-bit Enabled AIX | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
64-bit Enabled Solaris | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
Microsoft® Windows® for x64 | 6.1 | 6.3 | 9.3 TS1M1 | 9.4 TS1M1 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2013-08-15 10:35:43 |
Date Created: | 2013-07-30 15:23:49 |