Problem Note 49778: Copying a calendar with dates that include a Daylight Savings Time beginning or end might result in an unexpected calendar duration
Copying a calendar with dates that include a Daylight Savings Time (DST) beginning or end might result in an unexpected calendar duration in SAS® Promotion Optimization. For example, if you make a copy of a calendar that has a 7-day duration and the dates include a DST beginning, the resulting copy has a 6-day duration.
There is no workaround for this issue.
A fix for this issue is planned for a future software release.
Operating System and Release Information
| SAS System | SAS Promotion Optimization | Microsoft® Windows® for x64 | 5.2 | 5.2_M3 | 9.3 TS1M1 | 9.3 TS1M2 |
| Linux for x64 | 5.2 | 5.2_M3 | 9.3 TS1M1 | 9.3 TS1M2 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
| Type: | Problem Note |
| Priority: | high |
| Date Modified: | 2013-08-13 10:36:52 |
| Date Created: | 2013-04-29 08:32:11 |