![]() | ![]() | ![]() | ![]() | ![]() |
Copying a calendar with dates that include a Daylight Savings Time (DST) beginning or end might result in an unexpected calendar duration in SAS® Promotion Optimization. For example, if you make a copy of a calendar that has a 7-day duration and the dates include a DST beginning, the resulting copy has a 6-day duration.
There is no workaround for this issue.
A fix for this issue is planned for a future software release.
Product Family | Product | System | Product Release | SAS Release | ||
Reported | Fixed* | Reported | Fixed* | |||
SAS System | SAS Promotion Optimization | Microsoft® Windows® for x64 | 5.2 | 5.2_M3 | 9.3 TS1M1 | 9.3 TS1M2 |
Linux for x64 | 5.2 | 5.2_M3 | 9.3 TS1M1 | 9.3 TS1M2 |