Emerging Issues processing completes successfully, but the swaactivatebatchjobs program that starts the Emerging Issues child processes continues running. This problem occurs because the Job Control Table (JCT) is interrupted. As a result, the JCT record is not updated to RunCode=FINISHED.
As a workaround, use your operating system to terminate the swaactivatebatchjobs process manually.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Product Family | Product | System | Product Release | SAS Release | ||
Reported | Fixed* | Reported | Fixed* | |||
SAS System | SAS Warranty Analysis | Microsoft Windows Server 2003 Datacenter Edition | 4.1 | 4.2 | 9.1 TS1M3 SP4 | 9.2 TS2M2 |
Microsoft Windows Server 2003 Enterprise Edition | 4.1 | 4.2 | 9.1 TS1M3 SP4 | 9.2 TS2M2 | ||
Microsoft Windows Server 2003 Standard Edition | 4.1 | 4.2 | 9.1 TS1M3 SP4 | 9.2 TS2M2 | ||
64-bit Enabled AIX | 4.1 | 4.2 | 9.1 TS1M3 SP4 | 9.2 TS2M2 | ||
64-bit Enabled Solaris | 4.1 | 4.2 | 9.1 TS1M3 SP4 | 9.2 TS2M2 | ||
HP-UX IPF | 4.1 | 4.2 | 9.1 TS1M3 SP4 | 9.2 TS2M2 |