Multiproject Scheduling using SAS/OR Software
Gehan Corea, SUGI Proceedings, 1996
This paper presents an overview of the multiproject capabilities in SAS/OR® software. The 6.11 features in the CPM, GANTT, and NETDRAW procedures, many of which facilitate multiproject scheduling, are introduced. This is followed by an illustration of how you would use these features in conjunction with the analysis and reporting tools available in the SAS System to manage multiple projects, with special consideration given to the generation of resource utilization reports.