AGGREGATEPARENTRES
AGGREGATEP_RES
AGGREGPR
-
indicates that the resource requirements for all supertasks are to be used only for aggregation purposes and not for resource-constrained
scheduling.
-
DESCENDING
DESC
-
indicates that, in addition to the ascending sort variables (ES_ASC, LS_ASC, and SS_ASC) that are requested by the ESORDER,
LSORDER, and SSORDER options, the corresponding descending sort variables (ES_DESC, LS_DESC, and SS_DESC, respectively) are
also to be added to the Schedule output data set.
-
ESORDER
ESO
-
indicates that a variable named ES_ASC is to be added to the Schedule output data set; this variable can be used to order
the activities in such a way that the activities within each subproject are in increasing order of the early start time. This
order is not necessarily the same as the one that would be obtained by sorting all the activities in the Schedule data set
by E_START.
-
IGNOREPARENTRES
IGNOREP_RES
IGNOREPR
-
indicates that the resource requirements for all supertasks are to be ignored.
-
LSORDER
LSO
-
indicates that a variable named LS_ASC is to be added to the Schedule output data set; this variable can be used to order
the activities in such a way that the activities within each subproject are in increasing order of the late start time.
-
ORDERALL
ALL
-
is equivalent to specifying the ESORDER and LSORDER options (and the SSORDER option when resource constrained scheduling is
performed).
-
RSCHEDORDER
RSCHDORD
RSORDER
-
indicates that the order variables that are included in the Schedule output data set are also to be included in the Resource
Schedule output data set.
-
RSCHEDWBS
RSCHDWBS
RSWBS
-
indicates that the WBS code is also to be included in the Resource Schedule data set.
-
SEPCRIT
-
computes individual critical paths for each project. By default, the master project’s early finish time is treated as the
starting point for the calculation of the backward pass (which calculates the late start schedule). The late finish time for
each subproject is then determined during the backward pass on the basis of the precedence constraints. If a time constraint
is placed on the finish time of a subproject (using the ALIGNDATE and ALIGNTYPE variables), the late finish time of the subproject
is further constrained by this value.
The SEPCRIT option, on the other hand, requires the late finish time of each subproject to be less than or equal to the early
finish time of the subproject. Thus, if you have a set of independent, parallel projects, the SEPCRIT option enables you to
compute separate critical paths for each of the subprojects.
-
SSORDER
SSO
-
indicates that a variable named SS_ASC is to be added to the Schedule output data set; this variable can be used to order
the activities in such a way that the activities within each subproject are in increasing order of the resource-constrained
start time.
-
USEPROJDUR
USEPROJDURSPEC
USESPECDUR
-
uses the specified subproject duration to compute the maximum allowed late finish for each subproject. This is similar to
the SEPCRIT option, except that the specified project duration is used to set an upper bound on each subproject’s late finish time instead of the project span as computed from the span of all the subtasks of the project. In other words, if E_START and E_FINISH are the early start
and finish times of the subproject under consideration, and the subproject duration is PROJ_DUR, where
PROJ_DUR = E_FINISH - E_START
then the SEPCRIT option sets
L_FINISH E_START + PROJ_DUR
while the USEPROJDUR option sets
L_FINISH E_START + DUR
where DUR is the duration specified for the subproject in the Activity data set.
-
WBSCODE
WBS
ADDWBS
-
indicates that the CPM procedure is to compute a WBS code for the activities in the project using the project hierarchy structure
specified. This code is computed for each activity and stored in the variable WBS_CODE in the Schedule output data set.