For SYSTEM 2000 Version: 11.6
Problem Status: ZC (Zap Coded) -- Fix has received limited testing
Description of Problem:
FUNCTIONS CONTAINING DATES WITH A 2 YEAR DATE FORMAT INCORRECTLY CALCULATE EVERY YEAR AS IF IT WERE IN THE 1900 TO 1999 RANGE. FUNCTIONS WITH DATES IN
Note: Please send email to s2k@sas.com telling us which problem fixes you have downloaded so we can keep track of the fixes at your site in case questions or problems arise.
Top of Zap Deck:
* IBM R11.6 BUG 4833 OS * * FUNCTIONS CONTAINING DATES CALCULATE INCORRECT NUMBER OF DAYS * WITH A TWO YEAR DATE FORMAT BY ASSUMING ALL DATES ARE IN THE * 1900-1999 RANGE. * * YOU MUST RUN PRELINK AFTER APPLYING THIS FIX * NAME S2K34 RETVAL VER 0BE6 58F0,6AC2,05EF,5840,8170 REP 0BE6 58F0,A068,47F0,FBCE,0700 * NAME S2K00 S2KPATCH VER 0BCE 0000,0000,0000,0000,0000,0000,0000,0000 VER 0BDE 0000,0000,0000,0000,0000,0000 REP 0BCE 5840,96BC,1BFF,50F0,96BC,58F0,6AC2,05EF REP 0BDE 5040,96BC,5840,8170,47F0,CBF0 CHECKSUM C59FF9C4
End of Zap Deck