Resources



Problem Fix Number: 4833

For SYSTEM 2000 Version: 11.6

Problem Status: ZC (Zap Coded) -- Fix has received limited testing

Description of Problem:

FUNCTIONS CONTAINING DATES WITH A 2 YEAR DATE FORMAT INCORRECTLY CALCULATE EVERY YEAR AS IF IT WERE IN THE 1900 TO 1999 RANGE. FUNCTIONS WITH DATES IN


Download Fix:

Note:   Please send email to s2k@sas.com telling us which problem fixes you have downloaded so we can keep track of the fixes at your site in case questions or problems arise.


Top of Zap Deck:

 *  IBM R11.6   BUG 4833  OS                                                     
 *                                                                               
 * FUNCTIONS CONTAINING DATES CALCULATE INCORRECT NUMBER OF DAYS                 
 * WITH A TWO YEAR DATE FORMAT BY ASSUMING ALL DATES ARE IN THE                  
 * 1900-1999 RANGE.                                                              
 *                                                                               
 * YOU MUST RUN PRELINK AFTER APPLYING THIS FIX                                  
 *                                                                               
 NAME S2K34 RETVAL                                                               
 VER 0BE6 58F0,6AC2,05EF,5840,8170                                               
 REP 0BE6 58F0,A068,47F0,FBCE,0700                                               
 *                                                                               
 NAME S2K00 S2KPATCH                                                             
 VER 0BCE 0000,0000,0000,0000,0000,0000,0000,0000                                
 VER 0BDE 0000,0000,0000,0000,0000,0000                                          
 REP 0BCE 5840,96BC,1BFF,50F0,96BC,58F0,6AC2,05EF                                
 REP 0BDE 5040,96BC,5840,8170,47F0,CBF0                                          
 CHECKSUM C59FF9C4                                                               

End of Zap Deck