This advanced example demonstrates how to warm start PROC OPTMILP by using the PRIMALIN= option. The model is constructed in PROC OPTMODEL and saved in an MPS-format SAS data set for use in PROC OPTMILP. This problem can also be solved from within PROC OPTMODEL; see Chapter 7 for details.
Consider the classical facility location problem. Given a set L of customer locations and a set F of candidate facility sites, you must decide on which sites to build facilities and assign coverage of customer demand to these sites so as to minimize cost. All customer demand must be satisfied, and each facility has a demand capacity limit C. The total cost is the sum of the distances between facility j and its assigned customer i, plus a fixed charge for building a facility at site j. Let represent choosing site j to build a facility, and 0 otherwise. Also, let represent the assignment of customer i to facility j, and 0 otherwise. This model can be formulated as the following integer linear program:
Constraint (assign_def) ensures that each customer is assigned to exactly one site. Constraint (link) forces a facility to be built if any customer has been assigned to that facility. Finally, constraint (capacity) enforces the capacity limit at each site.
Consider also a variation of this same problem where there is no cost for building a facility. This problem is typically easier to solve than the original problem. For this variant, let the objective be
First, construct a random instance of this problem by using the following DATA steps:
%let NumCustomers = 50; %let NumSites = 10; %let SiteCapacity = 35; %let MaxDemand = 10; %let xmax = 200; %let ymax = 100; %let seed = 938; /* generate random customer locations */ data cdata(drop=i); length name $8; do i = 1 to &NumCustomers; name = compress('C'||put(i,best.)); x = ranuni(&seed) * &xmax; y = ranuni(&seed) * &ymax; demand = ranuni(&seed) * &MaxDemand; output; end; run; /* generate random site locations and fixed charge */ data sdata(drop=i); length name $8; do i = 1 to &NumSites; name = compress('SITE'||put(i,best.)); x = ranuni(&seed) * &xmax; y = ranuni(&seed) * &ymax; fixed_charge = 30 * (abs(&xmax/2-x) + abs(&ymax/2-y)); output; end; run;
The following PROC OPTMODEL statements generate the model and define both variants of the cost function:
proc optmodel; set <str> CUSTOMERS; set <str> SITES init {}; /* x and y coordinates of CUSTOMERS and SITES */ num x {CUSTOMERS union SITES}; num y {CUSTOMERS union SITES}; num demand {CUSTOMERS}; num fixed_charge {SITES}; /* distance from customer i to site j */ num dist {i in CUSTOMERS, j in SITES} = sqrt((x[i] - x[j])^2 + (y[i] - y[j])^2); read data cdata into CUSTOMERS=[name] x y demand; read data sdata into SITES=[name] x y fixed_charge; var Assign {CUSTOMERS, SITES} binary; var Build {SITES} binary; /* each customer assigned to exactly one site */ con assign_def {i in CUSTOMERS}: sum {j in SITES} Assign[i,j] = 1; /* if customer i assigned to site j, then facility must be */ /* built at j */ con link {i in CUSTOMERS, j in SITES}: Assign[i,j] <= Build[j]; /* each site can handle at most &SiteCapacity demand */ con capacity {j in SITES}: sum {i in CUSTOMERS} demand[i] * Assign[i,j] <= &SiteCapacity * Build[j]; min CostNoFixedCharge = sum {i in CUSTOMERS, j in SITES} dist[i,j] * Assign[i,j]; save mps nofcdata; min CostFixedCharge = CostNoFixedCharge + sum {j in SITES} fixed_charge[j] * Build[j]; save mps fcdata; quit;
First solve the problem for the model with no fixed charge by using the following statements. The first PROC SQL call populates
the macro variables varcostNo
. This macro variable displays the objective value when the results are plotted. The second PROC SQL call generates a data
set that is used to plot the results. The information printed in the log by PROC OPTMILP is displayed in Output 12.3.1.
proc optmilp data=nofcdata primalout=nofcout; run; proc sql noprint; select put(sum(_objcoef_ * _value_),6.1) into :varcostNo from nofcout; quit;
proc sql; create table CostNoFixedCharge_Data as select scan(p._var_,2,'[],') as customer, scan(p._var_,3,'[],') as site, c.x as xi, c.y as yi, s.x as xj, s.y as yj from cdata as c, sdata as s, nofcout(where=(substr(_var_,1,6)='Assign' and round(_value_) = 1)) as p where calculated customer = c.name and calculated site = s.name; quit;
Output 12.3.1: PROC OPTMILP Log for Facility Location with No Fixed Charges
NOTE: The problem nofcdata has 510 variables (510 binary, 0 integer, 0 free, 0 |
fixed). |
NOTE: The problem has 560 constraints (510 LE, 50 EQ, 0 GE, 0 range). |
NOTE: The problem has 2010 constraint coefficients. |
NOTE: The MILP presolver value AUTOMATIC is applied. |
NOTE: The MILP presolver removed 10 variables and 500 constraints. |
NOTE: The MILP presolver removed 1010 constraint coefficients. |
NOTE: The MILP presolver modified 0 constraint coefficients. |
NOTE: The presolved problem has 500 variables, 60 constraints, and 1000 |
constraint coefficients. |
NOTE: The MILP solver is called. |
Node Active Sols BestInteger BestBound Gap Time |
0 1 2 972.1737321 0 972.2 0 |
0 1 2 972.1737321 961.2403449 1.14% 0 |
0 1 2 972.1737321 966.4826332 0.59% 0 |
0 1 3 966.4832160 966.4826332 0.00% 0 |
NOTE: The MILP solver added 2 cuts with 85 cut coefficients at the root. |
NOTE: Optimal within relative gap. |
NOTE: Objective = 966.48321599. |
NOTE: The data set WORK.NOFCOUT has 510 observations and 8 variables. |
Next, solve the fixed-charge model by using the following statements. Note that the solution to the model with no fixed charge is feasible for the fixed-charge model and should provide a good starting point for PROC OPTMILP. The PRIMALIN= option provides an incumbent solution (“warm start”). The two PROC SQL calls perform the same functions as in the case with no fixed charges. The results from this approach are shown in Output 12.3.2.
proc optmilp data=fcdata primalin=nofcout primalout=fcout; run; proc sql noprint; select put(sum(_objcoef_ * _value_), 6.1) into :varcost from fcout(where=(substr(_var_,1,6)='Assign')); select put(sum(_objcoef_ * _value_), 5.1) into :fixcost from fcout(where=(substr(_var_,1,5)='Build')); select put(sum(_objcoef_ * _value_), 6.1) into :totalcost from fcout; quit; proc sql; create table CostFixedCharge_Data as select scan(p._var_,2,'[],') as customer, scan(p._var_,3,'[],') as site, c.x as xi, c.y as yi, s.x as xj, s.y as yj from cdata as c, sdata as s, fcout(where=(substr(_var_,1,6)='Assign' and round(_value_) = 1)) as p where calculated customer = c.name and calculated site = s.name; quit;
Output 12.3.2: PROC OPTMILP Log for Facility Location with Fixed Charges, Using Warm Start
NOTE: The problem fcdata has 510 variables (510 binary, 0 integer, 0 free, 0 |
fixed). |
NOTE: The problem has 560 constraints (510 LE, 50 EQ, 0 GE, 0 range). |
NOTE: The problem has 2010 constraint coefficients. |
NOTE: The MILP presolver value AUTOMATIC is applied. |
NOTE: The MILP presolver removed 0 variables and 0 constraints. |
NOTE: The MILP presolver removed 0 constraint coefficients. |
NOTE: The MILP presolver modified 0 constraint coefficients. |
NOTE: The presolved problem has 510 variables, 560 constraints, and 2010 |
constraint coefficients. |
NOTE: The MILP solver is called. |
Node Active Sols BestInteger BestBound Gap Time |
0 1 3 16070.0150023 0 16070 0 |
0 1 3 16070.0150023 9946.2514269 61.57% 0 |
0 1 3 16070.0150023 9962.4849932 61.31% 0 |
0 1 3 16070.0150023 9971.2514492 61.16% 0 |
0 1 3 16070.0150023 9974.9275328 61.10% 0 |
0 1 3 16070.0150023 9978.5731345 61.05% 0 |
0 1 3 16070.0150023 9979.3745788 61.03% 0 |
0 1 5 10974.7644641 9979.3923019 9.97% 0 |
0 1 5 10974.7644641 9979.5208558 9.97% 0 |
0 1 5 10974.7644641 9979.5208558 9.97% 0 |
NOTE: The MILP solver added 20 cuts with 546 cut coefficients at the root. |
161 39 6 10956.9025992 10944.3536279 0.11% 0 |
178 47 7 10956.5132414 10944.6740684 0.11% 0 |
184 23 8 10951.2533557 10944.7768754 0.06% 0 |
192 19 9 10949.9022614 10945.4269700 0.04% 0 |
210 15 10 10948.4603465 10946.4060659 0.02% 0 |
234 14 10 10948.4603465 10947.3970832 0.01% 0 |
NOTE: Optimal within relative gap. |
NOTE: Objective = 10948.460346. |
NOTE: The data set WORK.FCOUT has 510 observations and 8 variables. |
The following two SAS programs produce a plot of the solutions for both variants of the model, using data sets produced by PROC SQL from the PRIMALOUT= data sets produced by PROC OPTMILP.
Note: Execution of this code requires SAS/GRAPH software.
title1 "Facility Location Problem"; title2 "TotalCost = &varcostNo (Variable = &varcostNo, Fixed = 0)"; data csdata; set cdata(rename=(y=cy)) sdata(rename=(y=sy)); run; /* create Annotate data set to draw line between customer and */ /* assigned site */ %annomac; data anno(drop=xi yi xj yj); %SYSTEM(2, 2, 2); set CostNoFixedCharge_Data(keep=xi yi xj yj); %LINE(xi, yi, xj, yj, *, 1, 1); run; proc gplot data=csdata anno=anno; axis1 label=none order=(0 to &xmax by 10); axis2 label=none order=(0 to &ymax by 10); symbol1 value=dot interpol=none pointlabel=("#name" nodropcollisions height=0.7) cv=black; symbol2 value=diamond interpol=none pointlabel=("#name" nodropcollisions color=blue height=0.7) cv=blue; plot cy*x sy*x / overlay haxis=axis1 vaxis=axis2; run; quit;
The output from the first program appears in Output 12.3.3.
title1 "Facility Location Problem"; title2 "TotalCost = &totalcost (Variable = &varcost, Fixed = &fixcost)"; /* create Annotate data set to draw line between customer and */ /* assigned site */ data anno(drop=xi yi xj yj); %SYSTEM(2, 2, 2); set CostFixedCharge_Data(keep=xi yi xj yj); %LINE(xi, yi, xj, yj, *, 1, 1); run; proc gplot data=csdata anno=anno; axis1 label=none order=(0 to &xmax by 10); axis2 label=none order=(0 to &ymax by 10); symbol1 value=dot interpol=none pointlabel=("#name" nodropcollisions height=0.7) cv=black; symbol2 value=diamond interpol=none pointlabel=("#name" nodropcollisions color=blue height=0.7) cv=blue; plot cy*x sy*x / overlay haxis=axis1 vaxis=axis2; run; quit;
The output from the second program appears in Output 12.3.4.
The economic tradeoff for the fixed-charge model forces you to build fewer sites and push more demand to each site.