The BOM Procedure

Examples: BOM Procedure

This section contains examples that illustrate the features of the BOM procedure. Most of the examples use the data from the ABC Lamp Company product line described in the section "Getting Started: BOM Procedure".


Example 2.1: Bill of Material with Single Input Data Set

Example 2.2: Bill of Material with Lead Time Information

Example 2.3: Bill of Material with Scrap Factor Information

Example 2.4: Planning Bill of Material

Example 2.5: Modular Bills of Material

Example 2.6: Bills of Material with Repeated Relationships

Example 2.7: Bills of Material Verification

Example 2.8: Roll-Up Cost in Indented Bill of Material

Example 2.9: Bill of Material Explosion

Example 2.10: Aggregating Forecasts Using PROC BOM

Statement and Option Cross-Reference Tables

Previous Page | Next Page | Top of Page