Problem Note 9909: Multi-threaded Scheduler recurring downtime does not work
If you set a downtime to recur on a regular basis in the Campaign
Management Multi-threaded Scheduler, after the first completion of a
downtime the downtime setting is deleted. This prevents the downtime
from recurring at the next specified interval.
Operating System and Release Information
SAS System | SAS Campaign Management | Microsoft Windows XP Professional | 3.0 | 3.2 | | |
Microsoft Windows 2000 Professional | 3.0 | 3.2 | | |
Microsoft Windows 2000 Server | 3.0 | 3.2 | | |
Microsoft Windows 2000 Advanced Server | 3.0 | 3.2 | | |
Microsoft Windows NT Workstation | 3.0 | 3.2 | | |
Microsoft Windows 2000 Datacenter Server | 3.0 | 3.2 | | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Topic: | System Administration ==> Scheduling
|
Date Modified: | 2005-08-04 15:33:11 |
Date Created: | 2003-04-29 15:49:14 |