SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 67305: The Load Product Chain process template goes into an infinite loop in SAS® Demand Planning

DetailsHotfixAboutRate It

In SAS Demand Planning, the Load Product Chain process template might go into an infinite loop. This problem can happen when the input file contains a use case where, for example, Product1 is replaced by Product2 and Product2 is replaced by Product 1 at the same time, similar to this example:

LIFECYCLE_CD,PREDECESSOR_PRODUCT_ID,PREDECESSOR_DIM2_ID,SUCCESSOR_PRODUCT_ID,SUCCESSOR_DIM2_ID,SUCCESSOR_START_DT,PREDECESSOR_END_DT,SCALE_FACTOR_PCT,PHASING_PROFILE_VAL
T,Product1,geography1,Product2,,03Oct18,02Oct18,100,
T,Product2,geography1,Product1,,03Oct18,02Oct18,100,
;

Click the Hot Fix tab in this note for a link to instructions about accessing and applying the software update.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Intelligent Planning SuiteLinux for x648.238.23ViyaViya
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.