Problem Note 65206: A daily flow in SAS® Job Flow Scheduler does not run on Mondays, even when you select the "Every Weekday" option
The crontab service in Linux is not observing the correct value for weekdays when scheduling a flow with a daily recurrence. The job flow runs on Tuesday to Saturday, instead of Monday to Friday.
The issue can be observed after these steps are followed:
- Create a flow.
- Schedule the flow with a new time trigger.
- Select the Daily recurrence.
- Select Every Weekday.
- Schedule the flow.
The flow will not run on Mondays, because the range specified in the crontab service is 2–6 and not 1–5.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Job Flow Scheduler | Linux for x64 | 9.46 | | 9.4 TS1M6 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2019-12-16 15:37:36 |
Date Created: | 2019-12-05 10:44:24 |