Problem Note 64683: A promotion created from a copy might not include calendar vehicles at the master level from the original promotion
In SAS® Promotion Optimization, a promotion created from a copy might not include calendar vehicles at the master level from the original promotion. When this issue occurs, the original promotion includes a calendar vehicle at both the master level and in the regional promotion(s). When you make a copy of the promotion, the calendar vehicle is persisted in the regional promotion(s) but not at the master level.
There is no workaround for this issue.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Promotion Optimization | Linux for x64 | 5.4 | | 9.4 TS1M4 | |
Microsoft® Windows® for x64 | 5.4 | | 9.4 TS1M4 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2019-08-26 09:31:57 |
Date Created: | 2019-08-26 09:08:58 |