Problem Note 61421: When you run a Delta-Normal analysis with a single horizon and EVALDATE is not specified, the dates in the UI and in the SimStat data set do not match
In SAS® High-Performance Risk, when you run a Delta-Normal analysis with a single horizon and the evaluation date (EVALDATE= option) is not specified, the date shown in the user interface (UI) does not match the date shown in the SimStat data set. The date shown in the UI should match the date shown in the SimStat data set.
There are no errors.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS High-Performance Risk | Microsoft® Windows® for x64 | 3.8 | 4.1 | 9.4 TS1M4 | 9.4 TS1M5 |
64-bit Enabled AIX | 3.8 | 4.1 | 9.4 TS1M4 | 9.4 TS1M5 |
64-bit Enabled Solaris | 3.8 | 4.1 | 9.4 TS1M4 | 9.4 TS1M5 |
Linux for x64 | 3.8 | 4.1 | 9.4 TS1M4 | 9.4 TS1M5 |
Solaris for x64 | 3.8 | 4.1 | 9.4 TS1M4 | 9.4 TS1M5 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
In SAS® High-Performance Risk, when you run a Delta-Normal analysis with a single horizon and EVALDATE is not specified, the date shown in the UI does not match the date shown in the SimStat data set.
Type: | Problem Note |
Priority: | medium |
Topic: | Analytics ==> Financial Analysis
|
Date Modified: | 2017-11-17 09:38:31 |
Date Created: | 2017-11-15 18:41:37 |