![]() | ![]() | ![]() | ![]() | ![]() |
After you copy and paste an A/B Test node or you perform a Save As action on an existing campaign that contains an A/B Test node, downstream Communication nodes contain incorrect holdout codes.
For example, when the Cell code is CELL613910, the holdout code is expected to be CGCELL613910. However, the holdout does not reflect the Cell code. Instead, the holdout code has a value like CGCELL613724.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Product Family | Product | System | Product Release | SAS Release | ||
Reported | Fixed* | Reported | Fixed* | |||
SAS System | SAS Marketing Automation | Microsoft® Windows® for x64 | 6.3 | 9.4 TS1M1 | ||
64-bit Enabled AIX | 6.3 | 9.4 TS1M1 | ||||
64-bit Enabled Solaris | 6.3 | 9.4 TS1M1 | ||||
HP-UX IPF | 6.3 | 9.4 TS1M1 | ||||
Linux for x64 | 6.3 | 9.4 TS1M1 | ||||
Solaris for x64 | 6.3 | 9.4 TS1M1 |