Problem Note 58442: Changing the "From subject" and "To subject" fields in a Process node changes those fields in all Process nodes that have a Type value of Code
If your selection campaign includes more than one Process node and you change the From subject field, the To subject field, or both in one of the Process nodes, these fields might also change (unexpectedly) in all of the other Process nodes. This problem happens for Process nodes that have Code as a value for the Type property.
Although the subject IDs in the From Subject and To Subject fields might unexpectedly change in this way, the Process node still maintains the previous, unmodified, and correct subject IDs. The campaign uses these values when the campaign is executed.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Marketing Automation | Microsoft® Windows® for x64 | 6.4 | 6.5 | 9.4 TS1M2 | 9.4 TS1M3 |
64-bit Enabled AIX | 6.4 | 6.5 | 9.4 TS1M2 | 9.4 TS1M3 |
64-bit Enabled Solaris | 6.4 | 6.5 | 9.4 TS1M2 | 9.4 TS1M3 |
HP-UX IPF | 6.4 | 6.5 | 9.4 TS1M2 | 9.4 TS1M3 |
Linux for x64 | 6.4 | 6.5 | 9.4 TS1M2 | 9.4 TS1M3 |
Solaris for x64 | 6.4 | 6.5 | 9.4 TS1M2 | 9.4 TS1M3 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | medium |
Date Modified: | 2016-09-06 14:28:43 |
Date Created: | 2016-06-20 06:07:13 |