SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 58442: Changing the "From subject" and "To subject" fields in a Process node changes those fields in all Process nodes that have a Type value of Code

DetailsHotfixAboutRate It

If your selection campaign includes more than one Process node and you change the From subject field, the To subject field, or both in one of the Process nodes, these fields might also change (unexpectedly) in all of the other Process nodes. This problem happens for Process nodes that have Code as a value for the Type property.

Although the subject IDs in the From Subject and To Subject fields might unexpectedly change in this way, the Process node still maintains the previous, unmodified, and correct subject IDs. The campaign uses these values when the campaign is executed.

Click the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Marketing AutomationMicrosoft® Windows® for x646.46.59.4 TS1M29.4 TS1M3
64-bit Enabled AIX6.46.59.4 TS1M29.4 TS1M3
64-bit Enabled Solaris6.46.59.4 TS1M29.4 TS1M3
HP-UX IPF6.46.59.4 TS1M29.4 TS1M3
Linux for x646.46.59.4 TS1M29.4 TS1M3
Solaris for x646.46.59.4 TS1M29.4 TS1M3
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.