Problem Note 58017: Spanning resources are over committed if the duration is longer than original amount in PROC CPM

DetailsHotfixAboutRate It

In the CPM procedure, if the duration for an activity is driven past the original work amount, the associated spanning resources might be over committed. In this case, the spanning resource is incorrectly only allocated for the original work duration. An over-utilized resource is indicated by a negative value in the variable with the prefix A in the RESOURCEOUT= Usage data set.

Click the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemSAS Release
ReportedFixed*
SAS SystemSAS/ORTru64 UNIX9 TS M09.4 TS1M3
Linux9 TS M09.4 TS1M3
OpenVMS Alpha9 TS M09.4 TS1M3
HP-UX IPF9 TS M09.4 TS1M3
64-bit Enabled Solaris9 TS M09.4 TS1M3
64-bit Enabled HP-UX9 TS M09.4 TS1M3
64-bit Enabled AIX9 TS M09.4 TS1M3
Microsoft Windows XP Professional9 TS M0
Microsoft Windows Server 2003 Standard Edition9 TS M0
Microsoft Windows Server 2003 Enterprise Edition9 TS M0
Microsoft Windows Server 2003 Datacenter Edition9 TS M0
Microsoft Windows NT Workstation9 TS M0
Microsoft Windows 2000 Professional9 TS M0
Microsoft Windows 2000 Server9 TS M0
Microsoft Windows 2000 Datacenter Server9 TS M0
Microsoft Windows 2000 Advanced Server9 TS M0
Microsoft Windows Server 2003 Enterprise 64-bit Edition9 TS M0
Microsoft Windows Server 2003 Datacenter 64-bit Edition9 TS M0
Microsoft® Windows® for 64-Bit Itanium-based Systems9 TS M0
z/OS9 TS M09.4 TS1M3
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.