Problem Note 53148: SAS/ACCESS® Interface to IMS-DL/I programs issuing CHKP calls fail if referencing IMS v12 PSBs
SAS/ACCESS® Interface to IMS-DL/I programs that contain references to IO PCBs in support of CHKP calls fail with the following error if the IMS PSB is generated using IMS v12.
FUNC CHKP ONLY VALID WITH A IO PCB IN A DLI OS REGION
*** IMS DLI CALL ERROR *** STATUS= SE
The workaround is to use PSBs assembled with earlier versions of IMS, consider v11 or earlier, as they execute properly with IMS v12.
Note the IMS v12 PSBGEN macro has changed and produces a larger PSB. Details on the change are available from IBM at the following location:
http://www-01.ibm.com/support/knowledgecenter/SSEPH2_12.1.0/com.ibm.ims12.doc.rpg/rpg.htm?lang=en
Operating System and Release Information
SAS System | SAS/ACCESS Interface to IMS-DL/I | z/OS | 9.4 | 9.4 | 9.4 TS1M0 | 9.4 TS1M2 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2014-06-05 15:32:33 |
Date Created: | 2014-06-04 16:02:03 |