SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 51358: An "Analyze in Project" data selection in SAS® Warranty Analysis Enterprise Analytic can have an incorrect date range for the claim date

DetailsHotfixAboutRate It

An Analyze in Project data selection in SAS Warranty Analysis Enterprise Analytic might have an incorrect date range for the claim date. The date is set to be the end date of the EI claim period prior to the current EI claim period. It should be set to the end date of the current EI claim period.

Click the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Warranty Analysis ServerMicrosoft® Windows® for x644.316.19.3 TS1M0
64-bit Enabled AIX4.316.19.3 TS1M0
64-bit Enabled Solaris4.316.19.3 TS1M0
HP-UX IPF4.316.19.3 TS1M0
Linux for x644.316.19.3 TS1M0
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.