SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 50428: The status of nodes downstream might not change when you change a Process node in SAS® Customer Intelligence Studio 6.1

DetailsHotfixAboutRate It

When you change a Process node in a decision flow to point to a different process, all the nodes downstream remain in a ready state even though they should have changed to a non-ready state.

Click the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Customer Intelligence StudioMicrosoft® Windows® for x646.16.49.3 TS1M19.4 TS1M0
Microsoft Windows Server 2008 R2 for x646.16.49.3 TS1M19.4 TS1M0
Microsoft Windows Server 2008 for x646.16.49.3 TS1M19.4 TS1M0
Windows 7 Enterprise x646.16.49.3 TS1M19.4 TS1M0
Windows 7 Professional x646.16.49.3 TS1M19.4 TS1M0
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.