Problem Note 50428: The status of nodes downstream might not change when you change a Process node in SAS® Customer Intelligence Studio 6.1
When you change a Process node in a decision flow to point to a different
process, all the nodes downstream remain in a ready state even though they
should have changed to a non-ready state.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Customer Intelligence Studio | Microsoft® Windows® for x64 | 6.1 | 6.4 | 9.3 TS1M1 | 9.4 TS1M0 |
Microsoft Windows Server 2008 R2 for x64 | 6.1 | 6.4 | 9.3 TS1M1 | 9.4 TS1M0 |
Microsoft Windows Server 2008 for x64 | 6.1 | 6.4 | 9.3 TS1M1 | 9.4 TS1M0 |
Windows 7 Enterprise x64 | 6.1 | 6.4 | 9.3 TS1M1 | 9.4 TS1M0 |
Windows 7 Professional x64 | 6.1 | 6.4 | 9.3 TS1M1 | 9.4 TS1M0 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.