Problem Note 47132: Discrepancy between spend ($) in the approval summary and the summary list in the Markdown Approval screen
In SAS® High-Performance Markdown Optimization, there might be a discrepancy between spend ($) in the approval summary and the summary list in the Markdown Approval screen. Spend ($) in the approval list is incorrect when the month filter is selected on the approvals view, and multiple markdowns exist within the same month for a product. Spend ($) is incorrect in the approval list because some of the markdowns for the plan-product are ignored.
There is no workaround for this issue.
Operating System and Release Information
SAS System | SAS High-Performance Markdown Optimization | Linux for x64 | 4.3_M2 | 5.2 | 9.2 TS2M3 | 9.3 TS1M0 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2012-08-03 16:24:22 |
Date Created: | 2012-08-02 01:01:56 |