Problem Note 46908: Bar Chart with Reference lines in SAS® BI Dashboard might select the wrong value when you click a bar in the chart
When using the Bar Chart with Reference Lines display type as the source of an interaction or link in SAS BI Dashboard, the wrong value might be selected when you click a bar in the chart. Specifically, this problem can occur if you click on a bar at the same location that a reference line crosses the bar. Instead of getting information about the selected bar, you might get information about the first bar that the reference line passes through from the left-hand side of the bar chart.
Operating System and Release Information
SAS System | SAS BI Dashboard | z/OS | 4.3 | | 9.2 TS2M3 | |
Microsoft® Windows® for x64 | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows Server 2003 Datacenter Edition | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows Server 2003 Enterprise Edition | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows Server 2003 Standard Edition | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows Server 2003 for x64 | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows Server 2008 | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows Server 2008 for x64 | 4.3 | | 9.2 TS2M3 | |
Microsoft Windows XP Professional | 4.3 | | 9.2 TS2M3 | |
Windows 7 Enterprise 32 bit | 4.3 | | 9.2 TS2M3 | |
Windows 7 Enterprise x64 | 4.3 | | 9.2 TS2M3 | |
Windows 7 Home Premium 32 bit | 4.3 | | 9.2 TS2M3 | |
Windows 7 Home Premium x64 | 4.3 | | 9.2 TS2M3 | |
Windows 7 Professional 32 bit | 4.3 | | 9.2 TS2M3 | |
Windows 7 Professional x64 | 4.3 | | 9.2 TS2M3 | |
Windows 7 Ultimate 32 bit | 4.3 | | 9.2 TS2M3 | |
Windows 7 Ultimate x64 | 4.3 | | 9.2 TS2M3 | |
Windows Vista | 4.3 | | 9.2 TS2M3 | |
Windows Vista for x64 | 4.3 | | 9.2 TS2M3 | |
64-bit Enabled AIX | 4.3 | | 9.2 TS2M3 | |
64-bit Enabled Solaris | 4.3 | | 9.2 TS2M3 | |
HP-UX IPF | 4.3 | | 9.2 TS2M3 | |
Linux for x64 | 4.3 | | 9.2 TS2M3 | |
Solaris for x64 | 4.3 | | 9.2 TS2M3 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | medium |
Date Modified: | 2012-07-05 16:11:58 |
Date Created: | 2012-06-29 16:31:58 |