Usage Note 46208: Manual plans might become baseline plans
When you look at the plan properties window in the SAS® High-Performance Markdown Optimization client a plan that was created as a manual plan might show up as a baseline plan.
Plans might switch from manual to baseline over time. When a manual plan has a markdown in the future, it is displayed as a manual plan. When a manual plan has no markdowns in the future, it is displayed as a baseline plan, even when there were markdowns in the past. So as time goes on, when a markdown was in the future but it is now in the past, the plan type switches from manual to baseline.
Operating System and Release Information
| SAS System | SAS High-Performance Markdown Optimization | Linux for x64 | 4.3_M2 | | 9.2 TS2M3 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
| Date Modified: | 2012-04-09 09:14:46 |
| Date Created: | 2012-04-03 10:35:50 |