Problem Note 46206: An incorrect EOP Roll to BOP occurs when editing Rollup KPI (s)
An incorrect EOP Roll to BOP occurs within SAS® Merchandise Planning when editing Rollup KPI (s) when the lowest level of the worksheet is not included in the Task. Additionally, when editing Rollup KPI (s), the Rollup KPI dependent values will also be incorrect.
There are two options you can use to circumvent this issue.
Option 1: Change the template by adding the lowest level to the Task. (This level can be hidden)
Option 2: Keeping the template and tasks the same but instead of using Task Recalc when calculating the worksheet use Worksheet Recalc. If you use Task Recalc the problem will still exist.
Operating System and Release Information
| SAS System | SAS Merchandise Financial Planning | Microsoft Windows Server 2003 Enterprise Edition | 6.1.3M5 | | 9.1 TS1M3 SP4 | |
| 64-bit Enabled AIX | 6.1.3M5 | | 9.1 TS1M3 SP4 | |
| 64-bit Enabled Solaris | 6.1.3M5 | | 9.1 TS1M3 SP4 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
| Type: | Problem Note |
| Priority: | high |
| Date Modified: | 2012-04-23 15:37:18 |
| Date Created: | 2012-04-03 09:44:12 |