Problem Note 44082: SAS® Financial Management supplemental schedule detail dimension not updated when driven by a linked dimension
The supplemental schedule detail dimension member is not updated if the detail dimension is driven by a linked dimension. If you change the value of the linked dimension, the supplemental schedule detail dimension value remains the same as when the form set was saved.
Click the Hot Fix tab in this note to access the hot fix for this issue.
For additional information please contact SAS Technical Support.
Operating System and Release Information
SAS System | SAS Financial Management | Microsoft® Windows® for x64 | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Microsoft Windows Server 2003 Datacenter Edition | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Microsoft Windows Server 2003 Enterprise Edition | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Microsoft Windows Server 2003 Standard Edition | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Microsoft Windows Server 2003 for x64 | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Microsoft Windows Server 2008 for x64 | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Microsoft Windows XP Professional | 5.1 | 5.3 | 9.2 TS2M0 | 9.3 TS1M0 |
Windows Vista | 5.1 | | 9.2 TS2M0 | |
Windows Vista for x64 | 5.1 | | 9.2 TS2M0 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | medium |
Date Modified: | 2012-05-07 09:02:01 |
Date Created: | 2011-08-23 16:37:13 |