Problem Note 43141: Total Promoted Metrics might be incorrect
In SAS® Promotion Optimization, the Total Promoted Metrics might be incorrect. Specifically, you might notice that the Margin and Expected Change metrics are incorrect by a multiplier of 100.
There is no workaround for this issue.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Promotion Optimization | Microsoft Windows Server 2003 Datacenter Edition | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Enterprise Edition | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Standard Edition | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 for x64 | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2008 | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2008 for x64 | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
64-bit Enabled AIX | 4.2_M1 | 4.2_M2 | 9.2 TS2M3 | 9.2 TS2M3 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Total Promoted Metrics might be incorrect.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2011-05-04 14:10:49 |
Date Created: | 2011-05-03 15:46:49 |