Problem Note 43679: Decision diagram or campaign nodes might be incorrectly marked "Ready" in SAS® Customer Intelligence Studio
Some changes to a SAS® Real-Time Decision Manager diagram or campaign cause a node to become invalid. These changes include changes to an Event or an upstream process variable. Not all of these changes trigger a change to the node's state from "Ready" to "Not ready". Even after the validation process has identified a node as not being "Ready", this state might not be reported correctly in SAS Customer Intelligence Studio.
Operating System and Release Information
SAS System | SAS Real-Time Decision Manager | Microsoft Windows Server 2003 Datacenter Edition | 5.3 | 5.4 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 Enterprise Edition | 5.3 | 5.4 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 Standard Edition | 5.3 | 5.4 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 for x64 | 5.3 | 5.4 | | 9.2 TS2M0 |
Microsoft Windows Server 2008 for x64 | 5.3 | 5.4 | | 9.2 TS2M0 |
Microsoft Windows XP Professional | 5.3 | 5.4 | | 9.2 TS2M0 |
Microsoft® Windows® for x64 | 5.3 | 5.4 | | 9.2 TS2M0 |
Windows Vista | 5.3 | 5.4 | | 9.2 TS2M0 |
Windows Vista for x64 | 5.3 | 5.4 | | 9.2 TS2M0 |
64-bit Enabled AIX | 5.3 | 5.4 | | 9.2 TS2M0 |
64-bit Enabled Solaris | 5.3 | 5.4 | | 9.2 TS2M0 |
Linux for x64 | 5.3 | 5.4 | | 9.2 TS2M0 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | medium |
Date Modified: | 2012-01-03 12:32:18 |
Date Created: | 2011-07-07 12:50:06 |