Problem Note 42975: Scheduled projects that contain a condition might stop responding in SAS® Enterprise Guide®
When scheduling a SAS Enterprise Guide project that includes a condition, the scheduled project is started but then stops responding in the running state and does not complete. The taskeng.exe window appears, and you have to stop the tanskeng.exe process in Task Manager and remove the task in the Windows Scheduler. Note that the status for the Run Result in the Windows Task Scheduler will read Successful even though the project did not complete.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Enterprise Guide | Microsoft® Windows® for x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Datacenter Edition | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Enterprise Edition | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Standard Edition | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2003 for x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2008 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2008 for x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows XP Professional | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Enterprise 32 bit | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Enterprise x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Home Premium 32 bit | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Home Premium x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Professional 32 bit | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Professional x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Ultimate 32 bit | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows 7 Ultimate x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows Vista | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
Windows Vista for x64 | 4.3 | 4.305 | 9.2 TS2M3 | 9.2 TS2M3 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2011-04-15 13:34:12 |
Date Created: | 2011-04-15 12:49:37 |