Plans imported via SOAP might result in "Disaggregating" status in SAS® Pack Optimization.
Message similar to the following can be found in the log, indicating that the plan was successfully disaggregated and its status was updated.
2011-03-21 14:59:17,739 [DisaggregateImportedNeed-100370] DEBUG [] com.sas.solutions.di.server - Setting plan status to: 7 for plan: 100172
However, the SOAP thread never sees the update and does not return until the timeout period of the SOAP call is reached. Further more, the status of the plan remains "6" (disaggregating) in the PKO_PURCHASE_ORDER_PLAN table even though it should be "7"(disaggregated).
A fix for this issue is planned for a future software release.
Product Family | Product | System | Product Release | SAS Release | ||
Reported | Fixed* | Reported | Fixed* | |||
SAS System | SAS Pack Optimization | 64-bit Enabled AIX | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 |
Microsoft Windows Server 2008 | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 | ||
Microsoft Windows Server 2003 Standard Edition | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 | ||
Microsoft Windows Server 2003 Enterprise Edition | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 | ||
Microsoft Windows Server 2003 Datacenter Edition | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 | ||
Microsoft Windows Server 2003 for x64 | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 | ||
Microsoft Windows Server 2008 for x64 | 2.2_M1 | 2.2_M1 | 9.2 TS2M3 | 9.2 TS2M3 |