Problem Note 42309: SASĀ® Warranty Analysis project-based analyses must be resubmitted manually after a data mart has been refreshed
After a data mart has been refreshed, the data selections in a project will be out-of-date. To bring the analyses based on these data selections up-to-date, you must resubmit them manually. For projects with many analyses, this process can be tedious and time-consuming.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Warranty Analysis | HP-UX IPF | 4.1 | 4.31 | 9.1 TS1M3 SP4 | 9.3 TS1M0 |
64-bit Enabled Solaris | 4.1 | 4.31 | 9.1 TS1M3 SP4 | 9.3 TS1M0 |
64-bit Enabled AIX | 4.1 | 4.31 | 9.1 TS1M3 SP4 | 9.3 TS1M0 |
Microsoft Windows Server 2003 Standard Edition | 4.1 | 4.31 | 9.1 TS1M3 SP4 | 9.3 TS1M0 |
Microsoft Windows Server 2003 Enterprise Edition | 4.1 | 4.31 | 9.1 TS1M3 SP4 | 9.3 TS1M0 |
Microsoft Windows Server 2003 Datacenter Edition | 4.1 | 4.31 | 9.1 TS1M3 SP4 | 9.3 TS1M0 |
Microsoft Windows 2000 Server | 4.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Datacenter Server | 4.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Advanced Server | 4.1 | | 9.1 TS1M3 SP4 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2011-05-27 10:00:05 |
Date Created: | 2011-02-04 16:35:30 |