Problem Note 39546: Incorrect base date results in empty valuation date in SAS® Risk Management for Banking
In SAS Risk Management for Banking 2.1, if you select the Results tab → Ad Hoc Reports → EXPOSURE_FACT from the Edit Results list → Project = PL_EXP, then the Valuation Date drop down box might be empty or incorrect. The Valuation Date values are associated with Base Date values in the Rd_work.Unique_projects table. The Valuation Date values are missing or incorrect because the Base Date values are incorrectly selected from the Rd_work.Unique projects table.
There is no workaround for this issue.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Risk Management for Banking | Solaris for x64 | 2.1 | 3.1 | | 9.2 TS2M0 |
Linux for x64 | 2.1 | 3.1 | | 9.2 TS2M0 |
Linux | 2.1 | 3.1 | | 9.2 TS2M0 |
HP-UX IPF | 2.1 | 3.1 | | 9.2 TS2M0 |
64-bit Enabled Solaris | 2.1 | 3.1 | | 9.2 TS2M0 |
64-bit Enabled HP-UX | 2.1 | 3.1 | | 9.2 TS2M0 |
64-bit Enabled AIX | 2.1 | 3.1 | | 9.2 TS2M0 |
Windows Vista | 2.1 | 3.1 | | 9.2 TS2M0 |
Windows Vista for x64 | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft Windows Server 2008 for x64 | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft Windows XP Professional | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 Datacenter Edition | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 Enterprise Edition | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 Standard Edition | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft Windows Server 2003 for x64 | 2.1 | 3.1 | | 9.2 TS2M0 |
Microsoft® Windows® for x64 | 2.1 | 3.1 | | 9.2 TS2M0 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2010-05-14 10:03:12 |
Date Created: | 2010-05-06 10:19:58 |