SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 38470: When creating the event selection, the date displays as the day before the actual date that is requested

DetailsHotfixAboutRate It

An event selection is created from the Data Selection workspace. The Repair Open Date is part of the event selection. However, in the actual event selection, the Repair Open Date shows as the day before the date that is requested in the user interface.

The problem can occur if the client is in a time zone that is different than that of the server. As a result, the client time is incorrectly converted to the different time zone.

Click the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Warranty AnalysisMicrosoft Windows Server 2003 Datacenter Edition4.14.29.1 TS1M3 SP49.2 TS2M2
Microsoft Windows Server 2003 Enterprise Edition4.14.29.1 TS1M3 SP49.2 TS2M2
Microsoft Windows Server 2003 Standard Edition4.14.29.1 TS1M3 SP49.2 TS2M2
64-bit Enabled AIX4.14.29.1 TS1M3 SP49.2 TS2M2
64-bit Enabled Solaris4.14.29.1 TS1M3 SP49.2 TS2M2
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.