SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 37868: Changing the project scope after partitioning might result in incompatible partitions

DetailsHotfixAboutRate It

In SAS® Size Profiling, if the scope of the data project is changed after partitioning, incompatible partitions might occur. Attributes or levels that do not apply to the scope selections might still appear in the partitions.

Click the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Size Profiling64-bit Enabled AIX1.22.29.1 TS1M3 SP49.2 TS2M2
Microsoft Windows Server 2003 Standard Edition1.22.29.1 TS1M3 SP49.2 TS2M2
Microsoft Windows Server 2003 Enterprise Edition1.22.29.1 TS1M3 SP49.2 TS2M2
Microsoft Windows Server 2003 Datacenter Edition1.22.29.1 TS1M3 SP49.2 TS2M2
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.