Problem Note 37739: System abend 0C4 occurs after a PLOT procedure is executed with the CONTOUR= option specified
A job that uses PROC PLOT with the CONTOUR= option specified might subsequently fail with system abend 0C4.
The failure can occur at different points, depending on memory allocation for the specific job. Failures have been reported during SAS® termination and during termination of the PROC PLOT step.
The problem is due to storage issues that result from using PROC PLOT with the CONTOUR= option.
Click the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | Base SAS | z/OS | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft® Windows® for 64-Bit Itanium-based Systems | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Datacenter 64-bit Edition | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Enterprise 64-bit Edition | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows XP 64-bit Edition | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft® Windows® for x64 | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Datacenter Edition | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Enterprise Edition | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Standard Edition | 9.2 TS2M0 | 9.2 TS2M3 |
Microsoft Windows XP Professional | 9.2 TS2M0 | 9.2 TS2M3 |
Windows Vista | 9.2 TS2M0 | 9.2 TS2M3 |
64-bit Enabled AIX | 9.2 TS2M0 | 9.2 TS2M3 |
64-bit Enabled HP-UX | 9.2 TS2M0 | 9.2 TS2M3 |
64-bit Enabled Solaris | 9.2 TS2M0 | 9.2 TS2M3 |
HP-UX IPF | 9.2 TS2M0 | 9.2 TS2M3 |
Linux | 9.2 TS2M0 | 9.2 TS2M3 |
Linux for x64 | 9.2 TS2M0 | 9.2 TS2M3 |
OpenVMS on HP Integrity | 9.2 TS2M0 | 9.2 TS2M3 |
Solaris for x64 | 9.2 TS2M0 | 9.2 TS2M3 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Storage issues might cause a job that uses PROC PLOT with the CONTOUR= option specified to fail with system abend 0C4. Failures have been reported during SAS® termination and during termination of the PROC PLOT step.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2009-12-01 11:33:46 |
Date Created: | 2009-11-05 13:00:12 |