Problem Note 36432: The Link node displays as Ready to Update Count instead showing of an actual count
In SAS® Customer Intelligence, when you create a diagram that is going to be used subsequently for linking, it is necessary to physically update the counts in the Cell node before you save the diagram. Otherwise, when you attempt to use this linked diagram in subsequent campaigns or diagrams, the Link node label reverts back to Ready to Update Count instead of showing a valid count. This is confusing to the user.
There is no workaround. Select the Hot Fix tab in this note to download the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Customer Intelligence Studio | Microsoft Windows 2000 Datacenter Server | 5.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Professional | 5.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Server | 5.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Advanced Server | 5.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows NT Workstation | 5.1 | | 9.1 TS1M3 SP4 | |
Microsoft Windows Server 2003 Datacenter Edition | 5.1 | 5.3 | 9.1 TS1M3 SP4 | 9.2 TS2M0 |
Microsoft Windows Server 2003 Enterprise Edition | 5.1 | 5.3 | 9.1 TS1M3 SP4 | 9.2 TS2M0 |
Microsoft Windows Server 2003 Standard Edition | 5.1 | 5.3 | 9.1 TS1M3 SP4 | 9.2 TS2M0 |
Microsoft Windows XP Professional | 5.1 | 5.3 | 9.1 TS1M3 SP4 | 9.2 TS2M0 |
Windows Vista | 5.1 | 5.3 | 9.1 TS1M3 SP4 | 9.2 TS2M0 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Problems can occur with Link nodes in SAS
® Customer Intelligence when you create a diagram that is going to be used later for linking.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2009-10-21 12:59:38 |
Date Created: | 2009-07-02 10:11:50 |