Problem Note 35683: Invalid Operation error when running an analysis project in SAS® Risk Dimensions®
When running an analysis project in SAS Risk Dimensions, the following error message might appear and the project will stop processing:
ERROR: Invalid Operation.
ERROR: Termination due to Floating Point Exception
These errors are known to appear if each of the following conditions hold true for a postprice variable in the risk analysis project. The postprice variable:
- is specified in a postprice method with COMPTYPE=PL
- has a non-missing basecase value
- is used in a simulation analysis
- has a missing value for some replication in the simulation
There is no workaround available.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Risk Dimensions Enterprise Edition | 64-bit Enabled HP-UX | 5.2 | 5.2_M1 | 9.2 TS2M0 | 9.2 TS2M2 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2009-12-01 15:13:01 |
Date Created: | 2009-04-24 14:12:55 |