Problem Note 34178: Large diagrams in SAS® Marketing Automation take a long time to redraw after you make changes
Complex SAS® Campaign Studio diagrams might take a long time to redraw after you make changes, depending on the nodes that they contain.
For example, if a diagram contains a Prioritize node, changing that node or another
might cause the diagram to refresh very slowly.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Campaign Studio | Microsoft® Windows® for x64 | 4.4 | 5.3_M3 | 9.1 TS1M3 SP4 | 9.2 TS2M3 |
Microsoft Windows 2000 Advanced Server | 4.4 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Datacenter Server | 4.4 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Server | 4.4 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Professional | 4.4 | | 9.1 TS1M3 SP4 | |
Microsoft Windows NT Workstation | 4.4 | | 9.1 TS1M3 SP4 | |
Microsoft Windows Server 2003 Datacenter Edition | 4.4 | 5.3_M3 | 9.1 TS1M3 SP4 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Enterprise Edition | 4.4 | 5.3_M3 | 9.1 TS1M3 SP4 | 9.2 TS2M3 |
Microsoft Windows Server 2003 Standard Edition | 4.4 | 5.3_M3 | 9.1 TS1M3 SP4 | 9.2 TS2M3 |
Microsoft Windows XP Professional | 4.4 | 5.3_M3 | 9.1 TS1M3 SP4 | 9.2 TS2M3 |
Windows Vista | 4.4 | 5.3_M3 | 9.1 TS1M3 SP4 | 9.2 TS2M3 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2008-12-12 12:29:41 |
Date Created: | 2008-12-11 15:47:40 |