SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 30445: Incorrect calendar might be displayed when you schedule dates in SAS® Campaign Studio

DetailsHotfixAboutRate It

When the day of the month of the system date is greater than 28, an incorrect calendar might be displayed in SAS Campaign Studio when you create or edit a schedule. This is most likely to occur when you change from the system date month to a month that does not contain the system date's day value.

For example, if the system date is January 30, 2006 and you schedule a campaign in SAS Campaign Studio using the month of Febuary, 31 days will display on the calendar control even though there are only 28 days in the month of February.

Select the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Campaign StudioMicrosoft® Windows® for x644.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows 2000 Advanced Server4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows 2000 Datacenter Server4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows 2000 Server4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows 2000 Professional4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows NT Workstation4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows Server 2003 Datacenter Edition4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows Server 2003 Enterprise Edition4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows Server 2003 Standard Edition4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Microsoft Windows XP Professional4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
Windows Vista4.45.19.1 TS1M3 SP49.1 TS1M3 SP4
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.