Problem Note 30445: Incorrect calendar might be displayed when you schedule dates in SAS® Campaign Studio
When the day of the month of the system date is greater than 28, an incorrect calendar might be displayed in SAS Campaign Studio when you create or edit a schedule. This is most likely to occur when you change from the system date month to a month that does not contain the system date's day value.
For example, if the system date is January 30, 2006 and you schedule a campaign in SAS Campaign Studio using the month of Febuary, 31 days will display on the calendar control even though there are only 28 days in the month of February.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Campaign Studio | Microsoft® Windows® for x64 | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Advanced Server | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Datacenter Server | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Server | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Professional | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows NT Workstation | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Datacenter Edition | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Enterprise Edition | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Standard Edition | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Microsoft Windows XP Professional | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
Windows Vista | 4.4 | 5.1 | 9.1 TS1M3 SP4 | 9.1 TS1M3 SP4 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Date Modified: | 2008-06-09 11:44:16 |
Date Created: | 2007-10-30 15:35:09 |