Problem Note 21145: Project element types are not copied to the new project when copying an existing project
In SASĀ® Strategic Performance Management, when you copy a project, the project element types and scorecard element types should copy into the new project. However, the project elements fail to do so.
Select the Hot Fix tab above to obtain a fix for this issue.
Operating System and Release Information
SAS System | SAS Strategic Performance Management | 64-bit Enabled AIX | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows XP Professional | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Standard Edition | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Enterprise Edition | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Datacenter Edition | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Server | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Datacenter Server | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Advanced Server | 2.4 | 2.4.1 | | 9.1 TS1M3 SP4 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | alert |
Date Modified: | 2009-08-25 13:53:06 |
Date Created: | 2007-10-16 10:12:55 |