Problem Note 19172: Status of link nodes changes to 'Ready to Update Count' if cells in
an upstream diagram are altered
In SAS® Marketing Automation Campaign Studio, if a diagram contains
link nodes that reference more than one cell in an upstream diagram, and
you change any cells in that upstream diagram, the status of all
downstream link nodes that reference that diagram is changed to
'Ready to Update Count'.
You can re-set the status by updating counts on the link nodes.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Marketing Automation-Server | Microsoft Windows XP Professional | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Enterprise Edition | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Standard Edition | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows Server 2003 Datacenter Edition | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Server | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Professional | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Datacenter Server | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Microsoft Windows 2000 Advanced Server | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
64-bit Enabled Solaris | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
Solaris | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
AIX | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
64-bit Enabled AIX | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
HP-UX IPF | 4.4 | 5.1 | | 9.1 TS1M3 SP4 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Topic: | System Administration ==> Servers
|
Date Modified: | 2007-02-01 11:56:43 |
Date Created: | 2006-12-13 08:47:13 |