SUPPORT / SAMPLES & SAS NOTES
 

Support

Problem Note 19033: Choosing a date range of a single day in a SAS® Campaign Studio returns an incorrect date

DetailsHotfixAboutRate It

If you select a date range of a single day in a SAS Campaign Studio select node, the actual result will be the date for the previous day.

For example, if you use the date range "From 30 August 2006 to 30 August 2006", the generated SQL selects dates according to the following logic:

>= August 29 < August 30

The date resulting from this logic is August 29.

Select the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Marketing Automation-ServerMicrosoft Windows XP Professional4.45.19.1 TS1M3 SP4
Microsoft Windows Server 2003 Enterprise Edition4.45.19.1 TS1M3 SP4
Microsoft Windows Server 2003 Standard Edition4.45.19.1 TS1M3 SP4
Microsoft Windows Server 2003 Datacenter Edition4.45.19.1 TS1M3 SP4
Microsoft Windows 2000 Server4.45.19.1 TS1M3 SP4
Microsoft Windows 2000 Professional4.45.19.1 TS1M3 SP4
Microsoft Windows 2000 Datacenter Server4.45.19.1 TS1M3 SP4
Microsoft Windows 2000 Advanced Server4.45.19.1 TS1M3 SP4
64-bit Enabled Solaris4.45.19.1 TS1M3 SP4
Solaris4.45.19.1 TS1M3 SP4
AIX4.45.19.1 TS1M3 SP4
64-bit Enabled AIX4.45.19.1 TS1M3 SP4
HP-UX IPF4.45.19.1 TS1M3 SP4
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.