Usage Note 18126: Relative Period does not show correct value(s) in SPM Column Selection
In SAS® Strategic Performance Management (SPM) 2.2, the relative period
column does not show the correct value when used in the column
selection. If the user chooses Relative Period as a column in the
column selection, then uses the -1, -2, etc. for the relative period to
show, the value displayed will be the same as the current period.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Strategic Performance Management | Microsoft Windows NT Workstation | 2.2 | | 9.1 TS1M3 SP4 | |
Microsoft Windows Server 2003 Datacenter Edition | 2.2 | | 9.1 TS1M3 SP4 | |
Microsoft Windows Server 2003 Enterprise Edition | 2.2 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Advanced Server | 2.2 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Datacenter Server | 2.2 | | 9.1 TS1M3 SP4 | |
Microsoft Windows Server 2003 Standard Edition | 2.2 | | 9.1 TS1M3 SP4 | |
Microsoft Windows 2000 Server | 2.2 | | 9.1 TS1M3 SP4 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Usage Note |
Priority: | alert |
Date Modified: | 2006-08-09 16:36:22 |
Date Created: | 2006-07-21 12:14:39 |