SUPPORT / SAMPLES & SAS NOTES
 

Support

Usage Note 17090: Elements with different time period definitions may cause selection lists to be empty

DetailsHotfixAboutRate It

In SAS® Strategic Performance Management 2.1 (SPM), you may have problems assigning attributes to elements. When all attributes of a certain type have the time period defined as "FLOAT" for all Start and End dates, then there is no problem assigning those attributes. If all of the attributes except one have Start and End dates defined as "FLOAT" and the other attribute has any other value, then attempting to select an attribute will display an empty list, even when the current selected date is between the Start and End dates specified.

Select the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Strategic Performance ManagementMicrosoft Windows NT Workstation2.19.1 TS1M3 SP3
Microsoft Windows Server 2003 Standard Edition2.19.1 TS1M3 SP3
Microsoft Windows 2000 Server2.19.1 TS1M3 SP3
Microsoft Windows Server 2003 Datacenter Edition2.19.1 TS1M3 SP3
Microsoft Windows 2000 Advanced Server2.19.1 TS1M3 SP3
Microsoft Windows 2000 Datacenter Server2.19.1 TS1M3 SP3
Microsoft Windows Server 2003 Enterprise Edition2.19.1 TS1M3 SP3
Microsoft Windows 2000 Professional2.19.1 TS1M3 SP3
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.