Usage Note 16463: Changing a date and hitting enter may not correctly set the date in
diagrams
In SAS® Strategic Performance Management 2.1 (SPM), attempting to change the
date of a diagram, and hitting the ENTER key to accept the manually
entered date, will not correctly reset the date. If you tab out of the
date field to the GO button, the date will be set correctly.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Strategic Performance Management | Microsoft Windows NT Workstation | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows Server 2003 Standard Edition | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows 2000 Server | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows Server 2003 Datacenter Edition | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows 2000 Advanced Server | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows 2000 Datacenter Server | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows Server 2003 Enterprise Edition | 2.1 | | 9.1 TS1M3 SP3 | |
Microsoft Windows 2000 Professional | 2.1 | | 9.1 TS1M3 SP3 | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Usage Note |
Priority: | medium |
Date Modified: | 2006-01-02 11:03:53 |
Date Created: | 2005-11-10 09:48:03 |