Usage Note 16463: Changing a date and hitting enter may not correctly set the date in diagrams

DetailsHotfixAboutRate It

In SAS® Strategic Performance Management 2.1 (SPM), attempting to change the date of a diagram, and hitting the ENTER key to accept the manually entered date, will not correctly reset the date. If you tab out of the date field to the GO button, the date will be set correctly.

Select the Hot Fix tab in this note to access the hot fix for this issue.



Operating System and Release Information

Product FamilyProductSystemProduct ReleaseSAS Release
ReportedFixed*ReportedFixed*
SAS SystemSAS Strategic Performance ManagementMicrosoft Windows NT Workstation2.19.1 TS1M3 SP3
Microsoft Windows Server 2003 Standard Edition2.19.1 TS1M3 SP3
Microsoft Windows 2000 Server2.19.1 TS1M3 SP3
Microsoft Windows Server 2003 Datacenter Edition2.19.1 TS1M3 SP3
Microsoft Windows 2000 Advanced Server2.19.1 TS1M3 SP3
Microsoft Windows 2000 Datacenter Server2.19.1 TS1M3 SP3
Microsoft Windows Server 2003 Enterprise Edition2.19.1 TS1M3 SP3
Microsoft Windows 2000 Professional2.19.1 TS1M3 SP3
* For software releases that are not yet generally available, the Fixed Release is the software release in which the problem is planned to be fixed.