In Strategic Performance Mangement (SPM) 2.1, an attempt to execute a SPM Calculate process with a SAS batch process will result in an error referencing SPECIAL_EVENT_ENTITY_KEY. This error is related to user access credentials not being sent with the batch process so that the calculate process can be performed.
Select the Hot Fix tab in this note to access the hot fix for this issue.
Product Family | Product | System | Product Release | SAS Release | ||
Reported | Fixed* | Reported | Fixed* | |||
SAS System | SAS Strategic Performance Management | Microsoft Windows NT Workstation | 2.1 | 9.1 TS1M3 SP3 | ||
Microsoft Windows Server 2003 Standard Edition | 2.1 | 9.1 TS1M3 SP3 | ||||
Microsoft Windows 2000 Server | 2.1 | 9.1 TS1M3 SP3 | ||||
Microsoft Windows Server 2003 Datacenter Edition | 2.1 | 9.1 TS1M3 SP3 | ||||
Microsoft Windows 2000 Advanced Server | 2.1 | 9.1 TS1M3 SP3 | ||||
Microsoft Windows 2000 Datacenter Server | 2.1 | 9.1 TS1M3 SP3 | ||||
Microsoft Windows Server 2003 Enterprise Edition | 2.1 | 9.1 TS1M3 SP3 | ||||
Microsoft Windows 2000 Professional | 2.1 | 9.1 TS1M3 SP3 |