Problem Note 14988: Cannot set date in the Analysis Editor in SAS® Risk Dimensions® JAVA Client
When specifying an Evaluation Date in the Analysis Editor, the date
chosen in the Calendar Navigator is not the same date that is displayed
in the Analysis Editor when the Analysis is reopened.
For example, suppose today's date is 28FEB2005 and today is chosen as
the Evaluation Date in the Calendar Navigator. When the Analysis is
closed and reopend, an evaluation date of 05MAR2005 is displayed.
Select the Hot Fix tab in this note for information on how to obtain the hot fix for this issue.
Operating System and Release Information
SAS System | SAS Risk Dimensions Enterprise Edition | Microsoft Windows NT Workstation | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Microsoft Windows XP Professional | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Microsoft Windows 2000 Advanced Server | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Microsoft Windows 2000 Datacenter Server | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Microsoft Windows 2000 Professional | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Microsoft Windows 2000 Server | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Solaris | 4.1.3 | 4.2 | | 9.1 TS1M3 |
64-bit Enabled Solaris | 4.1.3 | 4.2 | | 9.1 TS1M3 |
64-bit Enabled HP-UX | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Linux | 4.1.3 | 4.2 | | 9.1 TS1M3 |
HP-UX | 4.1.3 | 4.2 | | 9.1 TS1M3 |
64-bit Enabled AIX | 4.1.3 | 4.2 | | 9.1 TS1M3 |
Tru64 UNIX | 4.1.3 | 4.2 | | 9.1 TS1M3 |
AIX | 4.1.3 | 4.2 | | 9.1 TS1M3 |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | medium |
Date Modified: | 2008-08-26 15:35:38 |
Date Created: | 2005-04-14 10:58:11 |