Problem Note 12622: Subsequent tasks submitted via the SAS Multi-Threaded Scheduler are not
being performed
Subsequent tasks submitted via the SAS Multi-Threaded Scheduler are not
being performed. The previous successfully completed task incorrectly
leaves a record in the ISMTASKSCHED table with the status of INPROG, (in
progress), thereby preventing any subsequent tasks from being started.
This has been observed when recurring tasks are submitted and the record
is not removed even though the task has reached the end of the
recurrence period.
This also happens intermittently even if the tasks are not recurring.
A Technical Support hot fix for this issue is available at:
http://www.sas.com/techsup/download/hotfix/cammts75.html#012622
Operating System and Release Information
SAS System | SAS Campaign Management | Microsoft Windows NT Workstation | 7.3 | | | |
Microsoft Windows XP Professional | 7.3 | | | |
Microsoft Windows 2000 Professional | 7.3 | | | |
Microsoft Windows 2000 Advanced Server | 7.3 | | | |
Microsoft Windows 2000 Server | 7.3 | | | |
Microsoft Windows 2000 Datacenter Server | 7.3 | | | |
*
For software releases that are not yet generally available, the Fixed
Release is the software release in which the problem is planned to be
fixed.
Type: | Problem Note |
Priority: | high |
Topic: | System Administration ==> Scheduling
|
Date Modified: | 2004-09-08 16:52:58 |
Date Created: | 2004-06-17 08:43:59 |